Workforce Housing Project Manager - Data Center Construction
World Wide Professional Solutions · Vernon, TX
Email me this job
World Wide Professional Solutions is a project solutions organization committed to implementing lean constructions, collaborative contracting, and execution approaches to enable breakthroughs in performance.
We are seeking a Workforce Housing Operations Project Manager to provide onsite construction management oversight for workforce housing supporting a major hyperscale data center development in the Vernon, Texas area. We are serving as the Owner's Representative, overseeing the general contractor (GC) responsible for constructing and delivering the housing facilities.
This position focuses on GC accountability, site infrastructure, housing construction, schedule and cost controls, quality, safety oversight, and phased turnover. The Project Manager will coordinate with the owner, GC, design team, authorities having jurisdiction, and housing operations stakeholders to ensure facilities are ready for safe occupancy as workforce demand increases.
This is a construction delivery and operational readiness role, not a day-to-day property management position.
Key Responsibilities - Owner's Representative and General Contractor Oversight
- Act as the onsite Owner's Representative for workforce housing construction; hold the GC accountable for contract deliverables, milestones, quality, budget, and completion.
- Lead regular construction coordination and progress meetings with the GC, design consultants, owner stakeholders, and other contractors as required.
- Review GC schedules, look ahead plans, procurement status, manpower plans, subcontractor performance, and recovery measures when progress falls behind.
- Track RFIs, submittals, design clarifications, change requests, pay applications, commitments, and potential impacts to scope, schedule, or cost.
- Monitor the GC's safety program and inspection practices, escalate concerns, and verify timely closure of corrective actions without assuming GC means and methods.
Workforce Housing Construction and Infrastructure
- Oversee construction interfaces for housing buildings or units, common areas, support facilities, and site amenities included in the approved project scope.
- Coordinate site development and enabling infrastructure, including grading, access roads, parking, stormwater, drainage, utility connections, and pedestrian circulation.
- Monitor installation and testing of relevant building systems and utilities, including electrical service, lighting, HVAC, plumbing, water, sewer, telecommunications, fire and life safety, and security systems.
- Review constructability and sequencing of conventional, prefabricated, or modular components where applicable, including logistics, deliveries, set activities, and trade coordination.
- Coordinate construction access, delivery routes, site logistics, and separation of active work zones from any occupied housing areas.
Operational Readiness, Occupancy, and Turnover
- Develop a phased completion and occupancy readiness plan aligned with anticipated workforce mobilization and the owner's priorities.
- Coordinate with housing operations teams on access, utilities, life safety, maintainability, common space readiness, housekeeping turnover, and operational handoff requirements.
- Verify GC completion of inspections, testing, required approvals, punch lists, and occupancy documentation before units or facilities are released for use.
- Manage turnover packages, as built documents, equipment information, warranties, training, deficiency tracking, and final closeout with the GC.
- Identify risks to housing availability and communicate timely mitigation plans, dependencies, and decisions needed from the owner.
Project Controls and Stakeholder Reporting
- Maintain owner side reporting for schedule milestones, cost exposure, change management, quality issues, safety observations, risk items, and corrective action status.
- Provide clear weekly updates and escalation recommendations to management and client leadership; document decisions and track actions to closure.
- Apply lean planning and collaborative problem solving to reduce rework, improve handoffs, and keep construction and occupancy milestones aligned.
Qualifications
- 8+ years of progressive construction project management or construction management experience, with significant field delivery and GC coordination responsibility.
- Experience overseeing vertical construction, large housing developments, multifamily, hospitality, workforce accommodations, or comparable site-based building programs.
- Strong grasp of civil and utility infrastructure, building trades, MEP systems, life safety, construction sequencing, and completion and closeout processes.
- Ability to act effectively as an Owner's Representative, review project controls, challenge contractor plans, and resolve issues through the appropriate contractual channels.
- Working knowledge of construction safety, QA/QC, applicable building codes, inspections, occupancy requirements, and authority approvals.
- Proficiency with construction documentation, reporting, and scheduling tools such as Procore, Primavera P6, or MS Project; strong communication and field leadership skills.
Preferred Background
- Construction of workforce housing, temporary or permanent accommodations, multifamily communities, student or military housing, hospitality, or large mixed-use developments.
- Site development, modular or prefabricated housing, accelerated schedules, or phased occupancy and handover programs.
- Experience supporting large industrial, energy, infrastructure, or mission critical construction programs with substantial craft workforce mobilization.
- Owner's Representative or construction management consulting experience; bachelor’s degree in construction management, Engineering, or related field and PMP or CCM credentials are pluses.
Location and Travel
- Full time, 100% onsite position in Vernon, Texas.
- Relocation and mobilization support available.
- Per diem available for nonlocal candidates.
Benefits
- Medical, dental, and vision insurance.
- Life insurance.
- Short term and long-term disability coverage.
- 401(k) with company match.
- Paid holidays and paid time off.
- Sign-on and Annual Bonus Incentive Plans
World Wide Professional Solutions (WWPS) is committed to providing Equal Employment Opportunity in its personnel policies and practices. It is WWPS' policy to recruit, hire, train and promote Team Members and applicants for employment without regard to race, color, creed, religion, age, sex, marital status, registered domestic partner status, genetic information, sexual preference, sexual orientation, gender (including gender expression and gender identity), pregnancy (including childbirth or related medical conditions, including breastfeeding), military service, national origin, ancestry, citizenship, physical disability, mental disability, veteran status or any other protected classification under federal, state, or local law. All such decisions are based on (1) individual merit, qualifications, and competence as they relate to the particular position, and (2) promotion of the principle of equal employment opportunity.
All other terms and conditions of employment, such as compensation, benefits, transfers, layoff, return from layoff, training, education, and social and recreational programs, are administered without regard to the characteristics described above. To this end, WWPS complies with all provisions of Title VII of the Civil Rights Act of 1964 as amended, all of the rules, regulations and relevant orders of the Secretary of Labor, and all similar state and local laws.
The salary range for this full-time role is $153,100.00-$214,366.70 per year. Ranges are determined based on the position, geography, client and industry experience and level, and represent a good faith effort to provide a fair and equitable salary. This range reflects base salary only, and not the total compensation package. World Wide Professional Solutions reserves the right to pay more or less than the posted range, depending on a candidate’s experience, skills, and qualifications, including client requirements.
In addition to base salary, WWPS offers a comprehensive benefits package including:
- Medical
- Dental Insurance
- Vision Insurance
- 401(k)
- 401(k) Matching
- Paid Time Off
- Paid Holidays
- Short and long-term disability
- Employee Assistance Program
- Company-Paid Parental Leave
- State Paid Family and Medical Leave (where applicable)
- Lifestyle Spending Account (LSA)
- Professional Development & Tuition Assistance
#WWPS
#LI-PT1
This listing links to World Wide Professional Solutions's own application page. RackTrades is not the employer.